← Back to Case Studies

Case Study · Packaging Company · Pool Program

5-7% Regional Cost Reduction.

A packaging company reduced regional shipping costs through a multi-stop pool program designed and modeled by FreightPlus across three high-density regions.

5-7%
Reduction
3
Regions
Pool
Program

The Challenge

High-density shipping, no consolidation.

High-density regional shipping across three regions with no pool program in place. Each shipment moved independently, missing consolidation opportunities and driving up per-unit costs across the network.

The Solution

Multi-stop pool program design and modeling.

FreightPlus designed and modeled a multi-stop pool program analysis, identifying consolidation opportunities across three high-density regions. Each route was evaluated for stop density, frequency, and savings potential.

The Result

5 to 7% regional cost reduction.

5 to 7% regional cost reduction through pool program implementation. Reduced carrier touches, improved delivery windows, and lower cost per unit shipped across all three regions.

5-7%
Reduction
3
Regions
Pool
Program
Lower
Cost/Unit

Want results like these?

Run a 30 to 60 day pilot on select lanes. We benchmark the savings up front and prove them weekly.