Case Study · Packaging Company · Pool Program
A packaging company reduced regional shipping costs through a multi-stop pool program designed and modeled by FreightPlus across three high-density regions.
The Challenge
High-density regional shipping across three regions with no pool program in place. Each shipment moved independently, missing consolidation opportunities and driving up per-unit costs across the network.
The Solution
FreightPlus designed and modeled a multi-stop pool program analysis, identifying consolidation opportunities across three high-density regions. Each route was evaluated for stop density, frequency, and savings potential.
The Result
5 to 7% regional cost reduction through pool program implementation. Reduced carrier touches, improved delivery windows, and lower cost per unit shipped across all three regions.
Run a 30 to 60 day pilot on select lanes. We benchmark the savings up front and prove them weekly.